New energy

Product Details

Industrial and Commercial Photovoltaic-Storage Hybrid Energy Storage Unit – SGE-1XLP

Syncorepower SGE-1XLP Industrial & Commercial Integrated PV-ESS Hybrid Energy Storage Cabinet

Product Overview

Are factory and commercial operators plagued by sky-high peak electricity tariffs, unstable grid power supply, unexpandable fixed-capacity energy storage equipment, and hidden fire risks inside battery storage rooms? Syncorepower SGE-1XLP all-in-one industrial & commercial PV-energy storage cabinet is a liquid-cooled integrated energy storage solution tailor-made for factories, shopping malls, industrial parks and large commercial complexes.

This integrated cabinet integrates square LFP lithium battery packs, high-efficiency bidirectional PCS, intelligent EMS cloud monitoring and multi-layer fire suppression systems into one compact cabinet. It supports flexible modular capacity expansion, multiple revenue streams including peak-valley arbitrage, demand response and virtual power plant participation, and delivers 24-hour full intelligent monitoring with real-time safety early warning. With a long 6000-cycle battery lifespan, 97% maximum AC efficiency and IP54 full protection, it cuts enterprise comprehensive electricity expenditure by up to 72%, stabilizes grid power quality, and shortens project investment payback period to 3–4 years.

Quantified Core Selling Points (Feature → Solved Pain → Measurable User Benefit)

  1. Multi-Layer Integrated Fire Protection Design, Dual Fire Prevention & Suppression
    Equipped with multi-stage temperature sensing, smoke detection and automatic fire suppression linkage systems covering battery, PCS and wiring compartments. It intercepts 99% potential thermal runaway and fire hazards inside the cabinet, eliminating the huge safety risk of battery fire accidents in commercial sites and cutting fire safety management labor costs by 80%.
  2. Multi-Source Profit Model: Peak-Valley Arbitrage, Demand Response & VPP Participation
    Supports multiple revenue-generating operation modes simultaneously. Store cheap off-peak grid power and free daytime PV power for use during high-price peak hours to slash peak electricity bills by 72%. It can also participate in grid demand response and virtual power plant dispatching to gain extra auxiliary service income, creating dual profit channels for commercial owners and accelerating investment recovery by 25%.
  3. Cloud-Edge Collaborative Intelligent Monitoring, 24/7 Real-Time Safety Early Warning & Automatic Inspection
    Built-in EMS intelligent management system connected to cloud platform via 4G/CAN/RS485 communication. It runs real-time full-system performance tracking, abnormal parameter early warning and periodic automatic equipment inspection without on-site manual patrols. Save 100% daily energy storage operation labor cost and realize unattended intelligent management.
  4. Modular Integrated Layout, Flexible Capacity Deployment & Easy Site Layout
    All battery, power conversion, cooling and fire control modules are pre-integrated inside a single cabinet. Capacity can be customized from 215kWh to 261kWh, and multiple cabinets can be combined for larger projects. No complicated separate battery room and inverter room construction is needed, cutting civil engineering and installation construction cost by 40% and shortening project delivery cycle by 30%.
  5. 6000 Deep Cycle LFP Cells, Ultra-Low Annual Decay & 10+ Year Service Life
    Adopts high-quality square lithium iron phosphate cells with up to 6000 charge-discharge cycles, 3x longer service life than ordinary ternary batteries. Annual capacity decay is controlled below 3%, reducing battery replacement and renewal investment by 65% over a 10-year operation cycle.
  6. Liquid Cooling Heat Dissipation, Stable Operation From -30℃ to 55℃ Wide Temperature Range
    Adopts efficient liquid cooling circulation system, achieving uniform internal temperature distribution and avoiding local high-temperature cell attenuation. It stably operates from -30℃ extreme cold to 55℃ high temperature, suitable for northern cold factories and southern high-temperature industrial parks, reducing temperature-induced capacity loss by 45%.
  7. 97% Ultra-High AC Conversion Efficiency & 88% System Cycle Efficiency
    Industry-leading 97% maximum PCS AC efficiency and 88% whole-system energy cycle efficiency minimize energy loss during charging and discharging. Compared with low-efficiency air-cooled energy storage cabinets, it increases effective available stored energy by 12% and maximizes arbitrage profit per kWh of stored electricity.
  8. IP54 Protection + Optional C4/C5 Anti-Corrosion Grade, Adapt To Complex Industrial Environments
    Standard IP54 dustproof & waterproof cabinet body, with optional C4 / C5 anti-corrosion coating to resist factory chemical fumes, coastal salt fog and workshop dust. The cabinet can be placed outdoors or semi-open factory areas without independent sealed machine room construction.

Complete Technical Specification Table

Parameter CategorySyncorepower SGE-1XLP Integrated Energy Storage Cabinet
### DC Battery Parameters
Rated Battery Capacity261kWh (Customizable: 215kWh / 241kWh / 261kWh)
Rated Battery Voltage832V
Battery Operating Voltage Range720V ~ 864V
Battery Cell TypeSquare Lithium Iron Phosphate (LFP)
Single Cell Capacity314Ah
Battery Cycle Life (25℃)≥6000 cycles
Standard Charge / Discharge Current0.5C
Battery Pack Series & Parallel Layout1P*52S (5 groups)
### AC PCS Parameters
Rated AC Output Power125kW
Maximum AC Conversion Efficiency97%
Rated AC Voltage230V / 400V Three-phase
Rated AC Frequency50 / 60Hz
Current THD (Rated Load)<3%
Power Factor Range-0.9 lag ~ +0.9 lead
Voltage THD (Linear Load)<3%
### Whole System Parameters
System Energy Cycle Efficiency88%
Cabinet Protection GradeIP54
Anti-Corrosion GradeC3 standard; C4 / C5 optional
Operating Relative Humidity0 ~ 95% RH (Non-condensing)
Ambient Operating Temperature-30℃ ~ +55℃ (Power derating above 45℃)
Cooling MethodLiquid Cooling
Applicable Altitude≤4000m (Derating above 2000m)
BMS Communication InterfaceCAN2.0b
EMS Cloud Communication4G / CAN / RS485
Cabinet Outer Dimension (WDH)1692mm * 1385mm * 2220mm
Approx. Total Weight2200kg
Annual Capacity Decay Rate<3%
Standard Warranty5 Years

Core Product Advantages

1. All-In-One Pre-Integrated Modular Design, Greatly Cut Construction & Installation Cost

Traditional split energy storage systems require separate battery rooms, PCS rooms, independent fire control and cooling systems, with lengthy civil construction and complicated wiring. Syncorepower SGE-1XLP integrates batteries, bidirectional converter, liquid cooling, fire suppression and intelligent EMS into one single cabinet. It supports free combination of multiple cabinets for capacity expansion, eliminates expensive independent machine room investment, and shortens overall project construction cycle by 30% while cutting engineering cost by 40%.

2. Multi-Profit Operation Modes, Stable Extra Income For Industrial & Commercial Users

For manufacturing factories, shopping malls and industrial parks suffering high peak electricity prices, this cabinet stores low-cost off-peak grid power and free PV power generated on factory rooftops for peak-hour consumption, directly slashing peak electricity expenditure by up to 72%. Besides basic electricity cost saving, it supports grid demand response and virtual power plant dispatching to obtain extra government & grid auxiliary service subsidies, forming dual revenue streams and shortening project ROI to only 3–4 years.

3. Liquid Cooling Uniform Temperature Control, Extend Battery Service Life By 60%

Ordinary air-cooled energy storage cabinets suffer severe internal temperature imbalance, accelerating local cell attenuation and shortening overall battery life. The closed liquid cooling system realizes even heat dissipation for every cell inside the cabinet, controlling internal temperature difference within 3℃. It stably operates in -30℃ to 55℃ harsh environments, reducing temperature-induced cell aging speed by 45% and extending whole cabinet service life to over 10 years.

4. Multi-Link Full Fire Protection System, Eliminate Commercial Site Safety Hazards

Commercial energy storage projects face strict fire safety inspection standards. This cabinet adopts multi-layer safety design including smoke sensors, temperature probes, early thermal runaway warning and automatic fire suppression linkage covering battery compartments, power conversion cavities and wiring areas. It can detect abnormal temperature rise at the early stage of cell failure and trigger fire suppression automatically, intercepting 99% potential fire risks and fully meeting industrial fire safety acceptance requirements.

5. Cloud-Edge Collaborative 24h Unattended Intelligent Operation

The built-in EMS management platform connects with remote cloud monitoring system via 4G, CAN and RS485 multi-channel communication. It automatically collects real-time data of battery voltage, temperature, PCS power and cabinet environment, sends mobile terminal early warning alerts for all abnormal faults, and executes regular automatic system inspection without daily on-site staff patrol. Enterprises can save 100% daily energy storage operation labor expense and realize fully unmanned intelligent energy management.

6. Ultra-Long 6000-Cycle LFP Battery, Low Decay & Low Long-Term Renewal Cost

Equipped with high-capacity square lithium iron phosphate cells reaching 6000 deep charge-discharge cycles, 3 times longer service life than ordinary ternary lithium batteries. The annual capacity decay rate is controlled below 3%, avoiding frequent whole-battery replacement within 10 years of operation. Calculated over a 10-year cycle, it reduces long-term battery renewal and maintenance investment by 65% compared with low-cycle energy storage products.

Real Industrial & Commercial Application Cases with Quantified ROI

Case 1: Medium-Size Manufacturing Factory Peak-Valley Arbitrage Project

  • Configuration: 3 sets Syncorepower SGE-1XLP 261kWh integrated energy storage cabinets + 60kW three-phase PV hybrid inverter + 180kW rooftop PV array
  • Measurable Benefits: The factory’s original monthly peak industrial electricity bill reached $11,800. After putting the energy storage system into operation, the system stores off-peak cheap power and rooftop solar power for peak-hour production use, cutting monthly electricity cost by 72% to around $3,300, with annual electricity savings over $102,000. The cabinet participates in local grid demand response and gains extra annual auxiliary service income of $13,600, with total project payback period only 3.6 years. The integrated liquid cooling and multi-layer fire system passed local industrial fire inspection at one time without extra safety transformation cost.

Case 2: Large Shopping Mall Energy Storage Backup & Peak Shaving Project

  • Configuration: 4 sets SGE-1XLP 241kWh energy storage cabinets + 100kW commercial hybrid inverter
  • Measurable Benefits: Deployed in a downtown shopping mall with extremely high daytime peak power load. The system shifts peak power consumption, avoids expensive peak electricity prices and prevents demand charge penalties from the grid company, saving over $3,600 monthly. During unexpected grid blackouts, the cabinet provides stable emergency backup power for lighting, elevators and core retail equipment. The IP54 cabinet body is placed in semi-open outdoor equipment area without independent air-conditioned machine room construction, saving additional civil engineering investment of more than $22,000.

Case 3: Northern Industrial Park Off-Grid & Grid Stabilization Project

  • Configuration: 2 sets SGE-1XLP 215kWh integrated energy storage cabinets + 30kW off-grid PV system
  • Measurable Benefits: Located in a northern industrial park with unstable grid power and winter temperatures as low as -28℃. The wide-temperature liquid cooling design ensures normal system operation in extreme cold weather. The energy storage cabinet smooths grid voltage fluctuation caused by large motor production equipment, improving grid power supply stability. Combined with rooftop PV power generation, it reduces the park’s reliance on municipal grid power by 68%, effectively avoiding production shutdown losses caused by grid fluctuation and power outages.

Wide Application Scenarios

  1. Manufacturing factories, processing plants: peak-valley electricity arbitrage, peak load shifting and production power backup
  2. Shopping malls, commercial plazas, office buildings: demand response, emergency backup power and energy cost reduction
  3. Industrial parks, chemical parks and logistics warehouses: grid frequency regulation, new energy consumption and virtual power plant participation
  4. Coastal industrial zones, northern cold industrial bases: harsh environment integrated energy storage with anti-corrosion & wide-temperature adaptation
  5. Large-scale distributed PV matching projects: boost local PV self-consumption rate and stabilize grid output

Why Choose Syncorepower SGE-1XLP Integrated Energy Storage Cabinet?

Syncorepower specializes in high-safety, high-efficiency industrial & commercial integrated liquid-cooled energy storage systems. The SGE-1XLP cabinet integrates LFP battery packs, high-efficiency PCS, liquid cooling circulation, multi-stage fire suppression and cloud intelligent EMS into one modular cabinet. It supports customizable capacity from 215kWh to 261kWh, achieves 97% maximum AC efficiency and 6000 long battery cycles, and provides multiple profit channels including peak-valley arbitrage, demand response and VPP participation. Equipped with IP54 protection, optional C4/C5 anti-corrosion grade and -30℃~55℃ wide-temperature operation capability, it helps industrial and commercial clients cut comprehensive electricity expenditure by up to 72%, shorten investment payback to 3–4 years, and enjoy 5-year standard warranty with stable 10+ year service life, providing one-stop, low-investment energy storage solutions for global industrial and commercial energy-saving projects.

Important Safety & Operation Precautions

Humidity Control Requirement: Do not install the cabinet in fully closed unventilated spaces with condensation risk; keep relative humidity within the 0–95% non-condensing operating range to prevent circuit short-circuit faults.

Temperature Derating Rule: When the ambient temperature continuously exceeds 45℃, the cabinet will automatically derate output power to protect battery cells and PCS power devices; ensure good ventilation around the cabinet installation area.

Fire Protection Maintenance: Regularly inspect the smoke sensors, temperature probes and fire suppression device inside the cabinet every 6 months to guarantee normal linkage alarm and fire extinguishing function.

Parallel Combination Regulation: Only multiple SGE-1XLP cabinets of the same capacity and specification can be combined in parallel for capacity expansion; professional electricians are required for unified EMS parameter debugging.

Anti-Corrosion Installation Tip: For coastal, chemical plant and high-dust factory sites, select optional C4 / C5 anti-corrosion coating configuration to avoid cabinet shell and internal component corrosion damage.

Professional Operation Restriction: All cabinet installation, wiring, maintenance and internal disassembly work must be completed by certified energy storage professional technicians; non-professionals cannot open the sealed cabinet door privately, otherwise the official warranty will be invalidated.

Altitude Derating Reminder: When the installation altitude exceeds 2000m, the system will trigger power derating; configure appropriate capacity expansion in advance for high-altitude industrial projects.